Development Applications & Information

As of April 1, 2016, a joint pre-submittal meeting is required between the applicant, Davidson Planning Department, and Mecklenburg County for any project that will be submitted to EPM. Contact the Davidson Planning Department to set up a meeting. Failure to do so will result in a delay in accepting project intake. 

  1. Building Process
  2. Plans
  3. Plats
Building Process
The Individual Building process is required of all structures, except single-family detached housing and single-family detached accessory structures which meet the requirements of section 5. Reference section 14.11.

The Design Review Board (DRB) interprets and enforces the design regulations contained in the Davidson Planning Ordinance. The DRB reviews the design of all new construction, except single-family homes. Reference section 14.12 of the new ordinance.

The Design Review Board (DRB) interprets and enforces the design regulations for local historic signage as contained in Davidson Planning Ordinance as in Design Review for Sign. Approval for signage shall be gained prior to installation. Reference section 14.12 of the ordinance.

A Certificate of Appropriateness is required prior to beginning any project/s being proposed in the local historic district. A certificate of appropriateness can be obtained from the Design Review Board. Reference section 14.12 and Section 22 of the new ordinance.