Project Status



Recent Updates (8/28/17)

The Construction Drawings for Phase 2 of Davidson Woods were approved by the Town and Mecklenburg County on 8/25/17; construction will begin in the near future, connecting to Bailey Springs until the bridge to the first phase of Davidson Wood is completed. 


  1. Site Info
  2. Documents
  3. Contact

Site Info


  • Planning Area: Neighborhood General
  • Project Location: Davidson Hall Phase 2 is located at the southern terminus of Samuel Spencer Parkway
  • Parcel ID: 00709102
  • Acres: 32 +-
  • Development Description: A continuation of Davidson Wood Phase I, this is a single-family residential phase including 41 homes on 32 acres, with 14.21 acres of preserved open space (40% of site). Roadway connections are via Samuel Spencer Parkway, Park Terrace Lane and Bradford Park Drive. A greenway connection will also be provided to the Kincaid Trail from this phase of development.
  • Developer: Artisan Custom Homes